Harper Avenue Construction Site Secured Overnight
Last February, a developer called us at 3 AM after thieves stripped copper wiring from their half-built condos near Veterans Memorial Park. The snow was still falling, and their exposed site was wide open to the street. With more materials arriving at dawn, they couldn't risk another loss.
Our crew rolled out with temporary fencing panels and solar lights within 90 minutes. We anchored the 8-foot barriers into the frozen ground using our skid-steer mounted post driver. By sunrise, the entire perimeter was secure, and their crew could unload materials safely.
Your team saved us thousands in potential losses.
Tim, Harper Avenue Developer
